HUBBARD COMMUNICATIONS 0FFICE

           Saint Hill Manor, East Grinstead, Sussex

AOs

SHs

Power Pack

Class VIII    HCO BULLETIN OF 21 FEBRUARY 1970

  Checksheet

Class VII

  Checksheet            CONFIDENTIAL





               END PHENOMENA AND F/NS IN POWER



               (Your attention is called to

                HCO B 20 February 70, "Floating

                Needles and End Phenomena.")





       When I hear of Power being run - Pr Pr 4, 5 6 and the

three steps of VA in ten minutes or so on a pc I wonder who

is kidding.



       The purpose of Power is not to see how many pcs one

can audit in an hour but TO GIVE LASTING GAINS TO THE PC.



       In the first place, the case has to be set up  or Power.

All Dn Triples must have been run and the pc must have gone

whole track.  Without Whole Track, don't expect Power or any-

thing else to last.



       All Scn triples must have been successfully run.



       Any and all preparatory actions to make the case sure

of full gains and all psycho-somatic illnesses must have been

handled by auditing.



       Given these requisites, one comes to Power.



       Each Power process has its own End Phenomena - Pr Pr

4, 5 and 6.



       You don't audit Power to just an F/N.  You audit it to:



       1.  F/N.

       2.  The End Phenomena for that Power Process.

       3.  VGIs.



       The old saw "All auditors talk too much" was never

truer than in Power.



       The first F/N you see on the process in Power finds the

pc still introverted (looking inward).



       If you just carry on - maybe one more command or so -

you will see the pc hit the end phenomena and extrovert.



       Then VGIs will come in.



       The F/N will broaden widely and really float.



       Now tell him his needle is float1ng if you 1ike.  Rut

don't use "I would like to indicate to you your needle is

floating" to chop off the end phenomena!





                      Speed and Result





       Somewhere somebody got the idea that a "really good

auditor can go from 0 to IV in 15 minutes" and "Pr Pr 4 to VA

IC in 20 minutes."



       Speed has nothing to do with it.  As long as you don't

have a pc waiting for commands, speed is a worthless commodity

in auditing.



       One audits for results.



       The results of Pr Pr 4, 5 and 6 are the End Phenonena.

Each of these 3 processes has its own particular end pnenomena

and if that isn't obtained YOU HAVE NOT DELIVERED POWER.



       I re-researched all this very recently and these end

phenomena occur shortly after the first appearance of the F/N.

And when they occur you get a really wide float and a very

happy pc.



       The pc may or may not say what happened but he sure will

extrovert (look outward) sometimes with awe. Well, awe is not

VGIs.  What you really see is relief and then VGIs.



       So let him get his end phenomena.



       If you don't you leave a bit of charge there, by-passed,

which can result in an ARC Break later with Scientology.  ARC

Breaks are by-passed charge.



       And did you know that the first beginnings of an F/N are

often an ARC Break coming off the incident or bank? The pc goes

rapidly uptone as the F/N widens.



       So don't sell the team out.



       Run Power:



       1.  F/N.

       2.  End Phenomena.

       3.  VGIs



                                     L. RON HUBBARD

                                     FOUNDER

LRH:jz

Copyright (c) 1970

by L. Ron Hubbard

ALL RIGHTS RESERVED